Project Documents and Resources
ITC Project Joint Powers Authority
ITC Project Business Relocation Plan | Business Support Programs
Approved ITC Relocation Plan – Final (04/03/2023)
General FAQs on the ITC Project Business Relocation Plan and Business Support Programs (04/11/2023)
Relocation Plan Overview (02/17/2023)
Notice of Public Hearing Continued – New Hearing Date April 11, 2023 at 2PM (04/11/2023)
Notice of Public Hearing Continued – New Hearing Date April 4, 2023 at 4PM (03/11/2023)
Environmental Impact Report (CEQA)
Inglewood Transit Connector Project Draft Environmental Impact Report (EIR) (11/12/2021)
Draft EIR Environmental Impact Analysis
Draft EIR Greenhouse Gas Emissions
Draft EIR Population & Housing
Draft EIR Organizations Consulted
Draft EIR Terms Definitions Acronyms
Draft EIR Appendix B – Comments
Draft EIR Appendix C – Design Guidelines
Draft EIR Appendix E – Operating Systems
Draft EIR Appendix F – Construction Scenarios
Draft EIR Appendix I – Cultural
Draft EIR Appendix L – Hazards
Draft EIR Appendix M – Land Use
Inglewood Transit Connector Notice of Preparation (revised 09/10/2020)
Aviso de Preparación de el Proyecto del Conector de Tránsito de Inglewood (revisado 10/Sep/2020)
Inglewood Transit Connector Notice of Preparation (original 07/16/2018)
Inglewood Transit Connector Initial Study (revised 09/10/2020)
Inglewood Transit Connector Initial Study (original 07/16/2018)
Inglewood Transit Connector Initial Study: Technical Appendices
Environmental Assessment (NEPA)
Finding of No Significant Impact
Attachment A: Public Comment Summary and Responses
Attachment B: Environmental Commitments to Mitigate Effects
Attachment C: Public Comment Letters
Attachment D: Agency Correspondence and Interested Party Coordination
Attachment E: Cultural Resources Mitigation and Discovery Plan
Appendix D. Environmental Commitments Record
Appendix E. Plans, Profiles, and Operating Systems
Appendix F. California Environmental Quality Act Documents
Appendix H. Inglewood Transit Connector Design Standards and Guidelines
Appendix I. Inglewood Transit Connector Construction Commitment Program
Appendix J. City of Champions/Inglewood National Football League
Appendix K. Locally Preferred Alternative Reports
Appendix L. Transportation and Traffic Studies
Appendix M. Visual Impact Assessment
Appendix N. Air Quality and Greenhouse Gas Emissions Studies
Appendix O. Biological Resources Studies
Appendix P. Energy Calculations
Appendix Q. Environmental Justice Technical Report
Appendix R. Hazardous Materials Studies
Appendix S. Section 106 Documentation
Appendix T. Displacements and Acquisitions Technical Report
Appendix U. Noise and Vibration Studies
Appendix V. Draft Individual Section 4(f) Evaluation
Appendix W. Inglewood Transit Connector Project Baseline Construction Phasing Narrative
Disadvantaged Business Enterprise (DBE) Goal and Community Workforce
Presentations
ITC Presentation to the Inglewood Airport Area Chamber Roundtable and Mixer (05/18/2023)
Construction Network Presentation on the ITC Project (02/22/2022)
Public Meeting Presentation (11/22/21)
Public Meeting Presentation (11/22/21) – Spanish
ITC Request for Information (RFI) Industry Forum Presentation Deck (03/17/2021)
Inglewood City Council Management Briefing Presentation (02/13/2021)
Watch the Public Meeting Presentation with Q&A on the Draft EIR (01/13/2021)
Visit the Virtual Open House for the Draft Environmental Impact Report on the ITC (01/13/2021)
Inglewood Transit Connector Scoping Meeting Presentation (07/26/2018)
